Company News | NEWS

projeck case | halumm takes you to Linping No. 2 Primary School

2021-05-08

Project Brief Introduction 

In view of the renovation and renewal project of the Gangyuan Campus of Linping No. 2 Primary School in Hangzhou, in the face of problems such as tight construction period, heavy tasks and great difficulty, halumm relied on the high-precision prefabricated building technology system of "industrial design + precision manufacturing", adopted the integrated mode of design and construction, integrated modern teaching facilities and equipment with advanced functions, and achieved the successful delivery of the project in 60 days.

 

Event area

-Rich Campus Cultural Atmosphere-

 

-Beautiful Campus Environment-

 

Public areas

Prefabricated construction methods

 

Green environmental protection and pollution-free

Realize the "ready-to-use" teaching environment

Don't worry about formaldehyde anymore

Excellent sound insulation

 

Whether it's the sound of reading aloud or shouting and playing

Voices don't communicate with each other

Learn Xi and have fun

Teaching area

 

Give students the wings of imagination

Soar freely in the ocean of knowledge

In a sky-blue teaching space

Unleash the imagination of the students

Match the intelligent teaching system

Xi creative thinking in all aspects

Inspire the personality of life and bloom the color of youth

Relying on the design and construction model of "fast and efficient, green, healthy, and flexible", halumm creates a safe, comfortable, interactive and changeable campus, so that students love learning more every day than the day before, Xi!

The Previous: Accelerate the formation of new quality productive forces | halumm signed a cooperation agreement
Next Chapter: Respect|新冠疫情的逆行者