Company News | NEWS

Project|ALIBABA GROUP OFFICE

2021-12-29

In recent years, with the continuous development of technology and the rapid rise of the e-commerce field, Alibaba, as a giant in the e-commerce field, has continued to promote economic integration on a global scale, creating convenient online trading channels for the world, and promoting e-Marketplace of B2B international and domestic trading. 

 

halumm has a long cooperation with Alibaba to provided the prefabricated interior solutions for them, and has made a large number of great project. Among them, Shanghai Alipay Tower·S Space and Alibaba South China Operation Center projects are very representative.

 

 

 

01 Shanghai Alipay Tower·S Space Project

 

Shanghai Alipay Tower·S Space, named after the initials of "Shanghai", is located in Building 2 of Pudong Financial Plaza, with a total area of more than 40,000 square meters and a total of 20 floors. There are more than 3,500 Alipay Shanghai employees who are mainly financial and technological R&D talents has officially settled in. After being put into use, the Shanghai Alipay Building will develop into an Alipay international business center, serving as a window to connect with the world's finance and economic business, helping Ali's continuous and vigorous development of technological innovation.

At this project, the prefabricated integrated solution was applied novel color matching, which is covered a large area of white to bring spacious, simple and clear feeling to the whole office space; which is embellished with blue to increase vitality and to matching Alipay's Brand Color; and which is adopted the same color scheme of steel wall cabinet to complement surfaces, forming an integral visual effect.

 

halumm adopts multiple systems at this project: combined steel cabinet system, which is applied process of cold forming and integrated direct drinking water, home appliances facilities and other functions; the writable wallboard system, which is integrated aesthetics and functional, not only provided a neat community space but also intelligent working area. halumm provides a complete set of technical support system and technical service guarantee for material selection, production, construction, installation, operation and maintenance, etc., which has been greatly recognized by customers.

 

 


 

02 Alibaba South China Operation Center Project

The total investment of the Alibaba South China Operations Center Building project is 3.3 billion yuan, with a total construction area of about 139,800 square meters and a main building height of 207 meters. After being put into use, it will mainly carry Alibaba's digital economy, smart city, mobile Internet business and other businesses of Alibaba Group in southern China.

halumm provides customers with an integrated assembly-style interior solution based on industrial design + precision manufacturing. As the first high-rise Grade A office building of Alibaba's self-owned property, the integrated solution follows the high-quality dark business style; The space lines are applied the clear hues of black and white; the glass modules are properly applied between the lines, arranged in an orderly manner, standardized, modular, and high-precision craft style to create a rigorous and thorough business office environment.

 

Faced with the heavy pressure of the epidemic, halumm is not afraid of difficulties and forge ahead. It takes advantage of the fast and flexible installation of the prefabricated interior system. The construction of 10 floors was completed within 15 days, and high-quality delivery was achieved on time.

 

In the future, halumm will jointly develop new products with Alibaba, pioneering and innovating in the field of prefabricated office space, and continue to provide Alibaba’s global operation center with a safe, environmentally friendly, extremely fast installation, and diverse styles of prefabricated interior solutions.

The Previous: Accelerate the formation of new quality productive forces | halumm signed a cooperation agreement
Next Chapter: Project | HUAWEI OFFICE