Company News | NEWS

halumm’s Old Hospital Renovation Plan

2021-12-29


 

 

Patient

by hospital’s own account

1. It’s so difficult to rebuild, and I still have to maintain normal operations.

2. The schedule is tight, difficult, and the task is heavy. Who can help?

3. The construction pollution is large, the materials are not eco-friendly, and we dare not breathe.

4. Even the design drawing is handsome, but the finished product is ugly.

5. It is too hard to readjust space after the project ends.

 

Docter

This is the corrective actions from halumm

1.Simultaneous operation and construction: Applying the standardization, modularization, high-precision prefab component parts to achieve assembly construction, which is high efficiency, eco-friendly and low noise, and can be put into use after installation.
2.Magical construction speed: The construction is efficient, quick response, the project period is greatly shortened, the construction process is no noise, and the construction can be carried out at night and on weekends.

3.Eco-friendly is the principal: The raw materials of the parts and components meet the national standards, and the environmental protection treatment is implemented in advance before the factory prefabrication, dry operation, pollution-free, ecological and environmental protection.

4.Strictly implement the design plan: Through integrated design and BIM pre-planning simulation, the actual project effect is consistent with the design plan.

5.Identity information for Component parts: The parts and components have an "identity card" to meet the changes of the hospital's spatial structure and provide convenience for future functional upgrades.

 

 

-Projects-

 

The First Hospital of Zhejiang Province-It is a large-scale Class A general hospital integrating medical treatment, teaching, and scientific research. It is also the largest medical, teaching, and scientific research guidance center in Zhejiang Province, with a total construction area of 215,000 square meters and 2,200 beds. Due to the long history of the establishment (more than 70 years), the supporting facilities are relatively outdated and urgently need to be updated. Halumm provided it with an integrated assembly-type interior solution integrating standard, design, production, construction and operation and maintenance.

 

 

Public area

-The visual effect of the facade is exquisite and atmospheric-

-Stabilized and safe public aisle-

 

 

Nursing unit

 

 

 

 

 

Clinic unit

 

 

 

 

 

lecture hall

 

-Reasonable fabricated building structure materials, sound-absorbing devices, and terminal control systems-

 

The transformation of existing hospitals not only needs to consider the concrete use needs of medical staff, patients, scientific research and logistics, but also solve a series of traditional pain points in hospital transformation. With “industrial design + precision manufacturing” as the core, and "high precision, modularization, standardization, and informationization" as the characteristics, halumm presents structural optimization, functional integration, operation and construction integration, implementation and design for hospital transformation. A comprehensive solution that is consistent, humanistic aesthetics and practical, creating a comfortable, healthy, safe and eco-friendly hospital environment.

The Previous: Dubai makes another appearance | halumm house continues to expand its overseas "circle of friends"
Next Chapter: The Dream Office We Want!